A 21 MW dry season wind project above Butwal, Lumbini. The yield has never been measured, so this tool does not pretend to know it. It shows what the project looks like across the range the wind could plausibly take, and what twelve months of measurement would be worth.
Runs on public and reanalysis data only: Global Wind Atlas at 250 m, NASA POWER 2001 to 2025, Electricity Regulatory Commission published rates and Nepal Electricity Authority reported trade figures. No site measurement exists. This is a demonstrator, not a yield assessment, and no financing decision should rest on it.
Global Wind Atlas gives 8.09 m/s over Lumbini's windiest tenth and 10.47 m/s over its best 2%.
Power scales directly with air density, and a manufacturer's power curve is quoted at sea level. The Lumbini ridge sits near 1,400 m. Mustang is 2,700 m and above.
Reanalysis only. Wind speed uncertainty taken as 12%, which is what a lender assumes with no mast on site.
India's CERC range is INR 6.7 to 9.1 crore per MW, roughly USD 0.76m to 1.03m.
Solar is 5.94. Imports cost 9.18. The regulated winter rate for reservoir hydro is 14.80.
The same project, run 4,000 times against the wind speed uncertainty a lender would apply. Measurement does not move the expected outcome. It narrows the spread, and the spread is what decides whether anyone lends.
Weibull wind distribution against the turbine power curve. Energy is the product of the two, so the yield is decided by a narrow band of hours well above the mean.
The dry season rate needed for 1.30x cover at P50, against the rates Nepal already pays.
NASA POWER 2001 to 2025 at the Butwal cell, cubed on wind speed. The dry season carries 59.9% of annual output, against a rainfall peak in July twenty times the March figure.