A screening programme does not stop a slope failing. It changes when you find out. This runs a synthetic network of road slopes over ten years, lets some of them accelerate to failure, and measures how much warning satellite screening buys against inspecting on a fixed budget without it.
Every number on this page is generated. No Nepali slope is modelled and no real network is represented. Velocities are drawn from a distribution loosely anchored on published Himalayan values, and accelerating failures follow the standard creep pattern in which movement speeds up before collapse. This shows the shape of a decision, not a forecast of any site.
Each failure is preceded by months to years of accelerating movement.
This is the real constraint. The question is not how many slopes you inspect, it is which ones.
Raising this produces false flags on stable slopes and wastes visits, which is the honest cost of screening.
Cumulative displacement for a slope that failed. The marker shows when screening first flagged it, and the gap to the right is the warning the programme bought.
Months between the screening flag and the failure. The bars on the left are failures the programme never flagged in time.
Of the visits made each year, how many land on a slope that was genuinely moving. Screening does not add visits. It changes which slopes receive them.